Environmental consultancy · Douala, Cameroon

We turn a regulatory constraint into an authorised project.

ECOGEST prepares environmental and social impact studies for ports, dredging, industrial zones and municipalities. Every file meets Cameroonian regulation (MINEPDED) and the IFC Performance Standards.

What we do

Six fields, from project design to operation.

Environmental assessments

Detailed and summary ESIAs, impact notices (NIES), audits, strategic assessment.

Risk management

Hazard studies, emergency plans.

Hygiene and sanitation

Industrial cleaning, pest control, green spaces.

Environmental laboratory

Physico-chemical and bacteriological analyses, heavy metals.

Waste management

Plans for municipalities, ports and industries.

Training, advisory, safety

PPE, collective protection, safety and environmental training.

Our studies rely on Cameroonian Law No. 96/12 of 5 August 1996 and Decree No. 2013/0171/PM of 14 February 2013, together with lender frameworks: the World Bank Environmental and Social Framework (ESS 1 to 10), the IFC Performance Standards and the World Bank Group EHS Guidelines, the African Development Bank Integrated Safeguards System 2023 (OS1 to OS10), AFD policy and the Equator Principles (EP4). Each lender requirement is addressed in the same report as the Cameroonian requirements. Cameroon is a non-designated country under the Equator Principles, so projects there must meet the IFC Performance Standards.

Credentials

Accredited by MINEPDED.

2022

year activities began

13

assignments completed or under way

7

assignments at the Port of Douala

4

dredging assignments

MINEPDED accreditation No. A/EIES-AES 0009 of 21 April 2023, for environmental and social impact studies and audits. Trade register RC/YAE/2022/A/739.

Selected references

Three assignments that show how we work.

2 impact notices · Dredging

Douala-Bonabéri quay ramp

Hydraulic dredging and mechanical treatment of about 10,000 m³ of sediment each. Client: DEEPRIVERS SA. Both notices approved in September 2026.

Summary ESIA · Dual compliance

Dibamba river dredging

Logistics platform, MINEPDED and IFC Performance Standards. Client: DDLP SA. Terms of reference approved, ESIA in progress.

Plan and impact notice · Municipality

Solid waste management in Ngaoundal

Municipal plan (2024) and impact notice (2025), both approved. Client: Commune de Ngaoundal, funded by SEVES.

See all assignments (in French)

They trust us

Public institutions, local authorities and private operators entrust us with their environmental files.

  • Logo DDLP SA

    DDLP SA

  • Logo DEEPRIVERS SA

    DEEPRIVERS SA

  • Logo K9 SARLU

    K9 SARLU

  • Logo Port Autonome de Douala

    Port Autonome de Douala

  • Logo Commune de Ngaoundal

    Commune de Ngaoundal

  • Logo SEVES

    SEVES

  • MAGIC FOREST

    MAGIC FOREST Sarl

  • Logo MAGZI

    MAGZI

Team

Strong leadership, a pool of experts for each discipline.

ECOGEST works with a set of experts in civil engineering (BTP), environment, QHSE, forestry, maritime and port activities, among others. Each assignment is given to the experts whose specialty matches the project.

Christine Linda MBOZO'O, Director. Industrial and environmental risk management engineer.

Your project may be one file away from its authorisation.

Tell us about your site, your terms of reference or your lender's requirement. You receive a written proposal, with no commitment.

Open the contact form

contact@ecogest.cm · (+237) 698 374 114
Akwa, rue Mermoz, B.P. 6151 Douala, Cameroon